Hello, welcome to the website of Jiangyin LongRun Coatings Co., Ltd!
Products
Contact Us
Jiangyin LongRun Coating Co., Ltd
E-mail:Andy@zhcoating.com Cherry@zhcoating.com
Tel:+86-051086639366
Address:Add: No.2 Yulong Middle Road, Changzhou City, Jiangsu Province,China
Current location: Home > Products > Dacromet coatings

Dacromet coatings

  • Water - based Black Baking Sealing Topcoat
  • Water - based Black Baking Sealing Topcoat
  • Water - based Black Baking Sealing Topcoat
  • Water - based Black Baking Sealing Topcoat
  • Water - based Black Baking Sealing Topcoat
  • Water - based Black Baking Sealing Topcoat
  • Water - based Black Baking Sealing Topcoat
  • Water - based Black Baking Sealing Topcoat

Water - based Black Baking Sealing Topcoat

WP - 12H Water - based Black Baking Sealing Topcoat

I. Product Composition, Characteristics and Uses

 

This product is mainly composed of water - dilutable baking - type resin as the main base material, and is formed by grinding and dispersing various pigments, fillers and additives.
The coating of this product is flat and smooth, featuring high gloss, hardness and durability. It can be applied to the surface coating of various metal workpieces such as vehicles, construction machinery, home appliances, compressors, and Dacromet - coated parts.

 

II. Product Technical Indicators

 

Item

Indicator

Test Method

Original Paint State

Free of foreign matter and agglomeration; the paint is uniform after stirring

GB 3186 - 82

Appearance and Color of Paint Film

Flat, smooth, and the color meets the customer's requirements

Visual inspection

Non - volatile Matter (by Gloss), %

30 - 55

GB/T 1725 - 2007

Fineness, μm ≤

25 for high - gloss, 40 for matte

GB/T 1724 - 1989

Adhesion (Cross - cut Method), Grade ≤

1

GB/T 9286 - 1998

Drying Time at 140℃/min

30

GB/T 1728 - 79

60° Gloss

By agreement

GB/T 9754 - 2007

Pencil Hardness (Scratch) ≥

H

GB/T 6739 - 2006

Flexibility (mm)

1

GB/T 1731 - 1993

Salt Spray Resistance

240h

GB/T 1771 - 2007

 

*The salt - spray resistance performance is tested by a high - gloss film with integrated primer and topcoat.

 

III. Construction Process

Construction Conditions

During construction, the ambient temperature should be above 5℃, and the relative humidity of the air should not exceed 85%.

Surface Treatment

Before painting, the surface of the object to be coated should be free of oil, dust, and dry. It should undergo proper pre - treatment such as degreasing, rust - removal, and phosphating.

Construction Methods

Spraying or dipping

Recommended Spraying Pressure

 

0.35 - 0.60mPa

 

Dilution Ratio (Mass Ratio)

Coating : Deionized Water = 1:0.05 - 0.2

Construction Viscosity

30 - 60″/Ford Cup 4

Levelling Time

20-40min

Drying Temperature/ Time

180℃/30min

Levelling Time

20-40μm

 

 

Ⅳ.Compatibility

 

This product can be used in combination with Dacromet coatings, electrophoretic primers, water - based intermediate coatings, and clear topcoats (relevant tests are required).

 

Ⅴ.Packaging Transportation


  • Packaging: 30kg/drum or as per customer requirements.
  • Transportation: In summer, it is advisable to transport in the morning or evening to avoid sun exposure. In winter, avoid transportation below 0℃.

This product is manufactured in accordance with our production and product specifications, so we are accountable for its quality. However, as there are numerous factors influencing the results during use or testing, we cannot assume responsibility for the outcomes of use or testing. It is recommended to conduct an introduction test prior to extensive use.
The above information represents our latest understanding and R & D findings of the product, which may be subject to change without prior notice. Please contact us for the latest information when necessary.